Showing posts with label Daffodils. Show all posts
Showing posts with label Daffodils. Show all posts

Friday, September 21, 2007

Happy Friday


How can you be sad when you see this face sitting on your desk each day...especially when it's Friday.

Well I managed to meet one of my goals- I was able to complete section D on Daffodils, and have started into section E. It's coming along fabulously. It certainly is yellow.

On the GAL KAL,well, at least I have the weekend to work on it. I have finally completed clue 4 and jumped into clue 5 last night. this clue is a little more difficult, I had to knit each side of the square at least twice on the first row of this clue. The design changes, so you have to really make sure you didn't drop/miss a stitch from the row before. I know that sounds silly, and you're probably think 'Duh", but wait- it's harder to tell because the previous design was something like a 11 st repeat, but this new design is more like an 8 or 9 st repeat. So things didn't always match up. The good news was once you had the base row done, things progressed nicely. I will tackle this and see if I can't finish this clue before the end of the weekend. It will sort of keep me on track. Clue 6 is also only 34 rows, so If I run a little short this week, I will definitely try to catch up next week. It's so nice to see progress and to finally finish clue 4 ( it really did seem to take forever. I know several others from the KAL said something along these lines, but where this might have happened in the past, I didn't always agree with the complaint. This time I agree with the complaint).

Wednesday, September 19, 2007

I'm Knitting As Fast As I Can


Maybe, just maybe, I over estimated my ability to knit as much as I hoped.....

On the Daffodil Design, I am able to keep up with my projected section this week- I'm on row 67 of 72. I have made marvelous progress. I just need to keep plugging away. It's kind of like when I'm cycling up hill, I don't look at the top of the hill, I just put my head down and peddle, peddle, peddle. I get to the top soon enough ( or die trying...).

The color is really beginning to grow on me(or maybe my brain is just so excited that this really bright color is getting used and removed from the stash box...ya'think?).

As for the GALKAL- I was hoping to finish clue 5 by the end of this week- and I still have time, but I don't think I'll make this goal. All I had to do was finish clue 4 last weekend, but failed to do so. I can't tell you what I did instead ( sometimes the days run together), but I am on the last 2 rows of clue 4, haven't even started clue 5 and it's hump day. I will try, but doubt I'll make it. I would have to average something like 9 rows a day to meet this goal. Well, I guess it's link riding a bike uphill, don't look at the top, just peddle, peddle, peddle.

As for the mystery Shawl, I guess this one is really out of the question at this point. I so want to finish this GALKAL, and need to finish the Daffodill if I'm going to give as it's intended gift. So far, it looks pretty, and someday I'll have to try it.

For now, I will just put my head down and spin.

Monday, September 17, 2007

I'm Pacing Myself

Ok, so I figure I have to do a section/clue a week on my projects so I've got my work cutout for me.

Daffodils- This week I need to finish section D- 20 rows. No problem...except I'm not sure what I did with my book. I had it Friday at work, and thought I put it in my box of stuff to bring home, but I couldn't find it. I will look more tonight when I get home. I'm not as worried about this, I'm pretty sure I have my 4 rows of section D done for today.

GALKAL - the Galvestan Shawl. I am trying to finish clue 4 ( 6 rows to go), then I need to finish clue 5 by the end of this week. No problem, this clue is only 34 rows. 34 divided by 5 days- that's almost 5 rows a day. I can do this at night while watching TV with DD2.

Mystery Shawl 5- The first clue was given on Saturday. I was hoping to join in this one. I can jump in if I get my daily clotment done, but I won't push as hard on this project. Clue one is 60 rows, in a triangle styled shawl. This would go quickly. I am still thinking about whether I want to join the Halloween Shawl project or not. I wouldn't really get to work on it this month, it would definitly have to wait until I'm done with daffodils, before I could jump on that one!

I think when I break it down to these little goals, it's lots more do-able. Daffodils will continue to be worked on at work during slow times. GALKAL will be done mostly at home, as it's getting pretty big ( even if it's worked in the round on circular needles, it's still getting kind of big to travel with. And the MSG-5, well we'll see. I much prefer the square shawl to the Triangle, and I need to make up my mind on this one.

I only hope it's not too much for my hands to handle. That's a lot of knitting. I don't want to work my hands into soreness, it's just no fun ( not to mention the slow-down it causes).

Got lots of knitting to do.